HomeHelp and adviceHome improvements

Connecting to a sewer

upx加速器vn-outline

If you're planning to connect or reconnect to one of our sewers, you’ll need our consent before you go ahead. That’s because we need to check the connection will work as planned and that it won’t potentially cause problems such as sewer flooding or pollution. We have legal duties around this, set out in Section 94 of the Water Industry Act 1991 (‘the Act’).

Sewer connections can be made directly to a public sewer or indirectly to a private drain that in turn discharges to a public sewer. Whether your connection is direct, indirect, or if you're seeking to relocate an existing manhole, an application form must be completed.

You can either connect to a local sewer under Section 106 of the Act or in some circumstances to a trunk or chemical sewer under Section 107 of the Act. Connecting to trunk or chemical sewer can be complex and dangerous so we'll need to carry out this work for you.

If your proposals are covered by a planning application, no right of connection to a public sewer exists under the Water Industry Act 1991 until planning approval has been granted and any drainage conditions discharged. We'll therefore be unable to approve a sewer connection application made before planning is granted.

upx加速器vn-outline

upx加速器vn-outline

起飞加速器安卓下载,起飞加速器7天试用,起飞加速器2024年,起飞加速器vpm  海鸥加速器官网,海鸥加速器最新版,海鸥加速器npv,海鸥加速器vqn  云速加速器官方网址,云速加速器vnp,云速加速器打不开,云速加速器vps  vpm加速器官网,vpm加速器2024,vpm加速器vpm,vpm加速器vn  996CL跑路了,996CL不能用了,996CL打不开了,996CLvpm  gecko加速器下载地址,gecko加速器官网网址,gecko加速器vp,gecko加速器vps  vpm加速器官网网址,vpm加速器安卓下载,vpm加速器电脑版下载,vpm加速器pc版下载